Skip to main content

03D. backup site <> airfield comms test

Location: Airfield supporting garrison / forward base

Marking: OBJ Roma

Object: Documents

Type: Physical

Operation Gathered: Op Veritable 03 - 2025/11/15


[Signals data][Translated]

The communications test appears to be running optimally, with the transmission from grid 0623 1311 on bearing 253° maintaining stable strength at level 4 across the expected 4–5 km range. Signal quality remained consistent throughout the evaluation, indicating that the system is performing within operational expectations with no identifiable degradation or interference. Additionally, the designated backup site has been fully prepared and is ready to come online immediately if required now that stable comms have been installed and tested.